In this paper, some problems commonly encountered in the construction and production process of small hydro-power stations in China are analyzed and explained, and the solutions are provided as well. Existing problems we have are the shortage of Eco-flow discharge, the Oil pollution in downstream river course caused by power generation production at the station, the cooling water supply of hydro-power station and the problem of eliminating pollution, electromagnetic and noise pollution of station, the resident's dispute around the power station caused by the increase and decrease of the groundwater level at the location of the station, the flood control problem of the water diversion hub, the pollution of the river channel, and the danger caused by the height of trees under the transmission line. The author, who based on many years of practical experience in hydro-power stations, and combined with relevant state policies and regulations, and puts forward practical methods and ideas to solve the problem in close connection with the actual situation of the project.
Published in | American Journal of Water Science and Engineering (Volume 6, Issue 2) |
DOI | 10.11648/j.ajwse.20200602.14 |
Page(s) | 76-80 |
Creative Commons |
This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited. |
Copyright |
Copyright © The Author(s), 2020. Published by Science Publishing Group |
Ecological Flow, River Pollution, Electromagnetic and Noise Pollution, Down Wetland, Flood Control Management, Eliminate the Danger of Transmission Lines, Sustainable Development
[1] | Zhao jianda. Research on environmental protection and ecological problems in small hydropower development and their countermeasures [C]. Chinese academy of engineering. Yangtze river delta clean energy forum papers. Chinese academy of engineering: zhejiang association for science and technology, 2005: 172-178. |
[2] | You yufei, analysis of minimum ecological flow of hydropower station, water conservancy technical supervision, 2018.06. |
[3] | Fang liang, management of ecological discharge in hydropower station construction, design of hydropower station, 2013.03. |
[4] | Zhu ke. Analysis and treatment of turbine oil pollution in hydropower station [J]. Electromechanical information, 2011 (15): 210-211. |
[5] | ENT-16H, Automatic paddle vane regulation system for high Oil Pressure electro-hydraulic of turbine (R & D by Guangzhou Energy Science and Technology Co., Ltd.). |
[6] | Yu jianjun, "transformation of cooling system of small hydropower station", small hydropower station, 2013, no. 4, 2013.8. |
[7] | Jiang qian, dai qingzhong. Environmental issues in the design and manufacture of hydropower equipment [J]. Dongfang electric review, 2011, 25 (04): 50-57. |
[8] | Yu jianjun, "safe flood control of small hydropower stations", proceedings of the Chinese society of water conservancy 2011, October 2011. |
[9] | Liu changjun, yu jianjun, "discussion on environmental protection and pollution cleaning of small hydropower", "small hydropower", 12th issue of 2018, 2018.10. |
APA Style
Yu Jianjun, Li Xueming. (2020). Attention to Environmental Protection of Small Hydro-power Stations. American Journal of Water Science and Engineering, 6(2), 76-80. https://doi.org/10.11648/j.ajwse.20200602.14
ACS Style
Yu Jianjun; Li Xueming. Attention to Environmental Protection of Small Hydro-power Stations. Am. J. Water Sci. Eng. 2020, 6(2), 76-80. doi: 10.11648/j.ajwse.20200602.14
AMA Style
Yu Jianjun, Li Xueming. Attention to Environmental Protection of Small Hydro-power Stations. Am J Water Sci Eng. 2020;6(2):76-80. doi: 10.11648/j.ajwse.20200602.14
@article{10.11648/j.ajwse.20200602.14, author = {Yu Jianjun and Li Xueming}, title = {Attention to Environmental Protection of Small Hydro-power Stations}, journal = {American Journal of Water Science and Engineering}, volume = {6}, number = {2}, pages = {76-80}, doi = {10.11648/j.ajwse.20200602.14}, url = {https://doi.org/10.11648/j.ajwse.20200602.14}, eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.ajwse.20200602.14}, abstract = {In this paper, some problems commonly encountered in the construction and production process of small hydro-power stations in China are analyzed and explained, and the solutions are provided as well. Existing problems we have are the shortage of Eco-flow discharge, the Oil pollution in downstream river course caused by power generation production at the station, the cooling water supply of hydro-power station and the problem of eliminating pollution, electromagnetic and noise pollution of station, the resident's dispute around the power station caused by the increase and decrease of the groundwater level at the location of the station, the flood control problem of the water diversion hub, the pollution of the river channel, and the danger caused by the height of trees under the transmission line. The author, who based on many years of practical experience in hydro-power stations, and combined with relevant state policies and regulations, and puts forward practical methods and ideas to solve the problem in close connection with the actual situation of the project.}, year = {2020} }
TY - JOUR T1 - Attention to Environmental Protection of Small Hydro-power Stations AU - Yu Jianjun AU - Li Xueming Y1 - 2020/06/15 PY - 2020 N1 - https://doi.org/10.11648/j.ajwse.20200602.14 DO - 10.11648/j.ajwse.20200602.14 T2 - American Journal of Water Science and Engineering JF - American Journal of Water Science and Engineering JO - American Journal of Water Science and Engineering SP - 76 EP - 80 PB - Science Publishing Group SN - 2575-1875 UR - https://doi.org/10.11648/j.ajwse.20200602.14 AB - In this paper, some problems commonly encountered in the construction and production process of small hydro-power stations in China are analyzed and explained, and the solutions are provided as well. Existing problems we have are the shortage of Eco-flow discharge, the Oil pollution in downstream river course caused by power generation production at the station, the cooling water supply of hydro-power station and the problem of eliminating pollution, electromagnetic and noise pollution of station, the resident's dispute around the power station caused by the increase and decrease of the groundwater level at the location of the station, the flood control problem of the water diversion hub, the pollution of the river channel, and the danger caused by the height of trees under the transmission line. The author, who based on many years of practical experience in hydro-power stations, and combined with relevant state policies and regulations, and puts forward practical methods and ideas to solve the problem in close connection with the actual situation of the project. VL - 6 IS - 2 ER -