The principles of preparing ESIA for crude oil and gas pipelines are introduced and various stages of the report development are presented. The paper is a guideline for preparing an ESIA without any omitted measures of an oil or gas pipeline. These guidelines are presented in detail and will be handbook of presenting and introducing mitigation measures. It is aimed at presenting non quantitative ESIA and however at detailed flow of ESIA preparation.
Published in | International Journal of Environmental Monitoring and Analysis (Volume 3, Issue 3) |
DOI | 10.11648/j.ijema.20150303.17 |
Page(s) | 154-161 |
Creative Commons |
This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited. |
Copyright |
Copyright © The Author(s), 2015. Published by Science Publishing Group |
ESIA, Environmental and Social Impact Assessment, Mitigation, Livelihood, Landscape, Preparation of ESIA, Structure of ESIA
[1] | C. Barrow, Environmental and Social Impact Assessment, John Wiley, New York, 1997. |
[2] | N. Harvey and Beverley Clarke, Environmental Impact Assessment: Procedures and Practices, Oxford Uni. Press, 2012. |
[3] | R. K. Morgan, Environmental Impact Assessment: A Methodological Approach, Kluwer, 2002. |
[4] | F. Vanclay and A. M. Esteves, New Directions in Social Impact Assessment: Conceptual and Methodological Advances, Edward Elgar Pub., Northampton, Mass., 2012. |
[5] | A. Woodhouse, Social capital and economic development in regional Australia: A case study, Journal of Rural Studies, (22): 83-94, 2006. |
[6] | B. Noble, Introduction to Environmental Impact Assessment Guide to Principles and Practice, Don Mills ON: Oxford University Press, 2005. |
[7] | K. Hanna, Environmental Impact Assessment: Practice and Participation. Don Mills ON: Oxford University Press, 2005. |
[8] | C. Hua, Energy-related boom towns: problems, causes, policies, and modeling. In Large-Scale Energy Projects: Assessment of Regional Consequences, ed. T R Lakshmanan and B Johansson, pp. 215–232. Amsterdam: Elsevier Science Publishers, 1985. |
[9] | R. Chambers, Shortcut methods of gathering social information for rural development projects, In Putting People First: sociology and development projects, 1985. |
[10] | R. Chambers and G. Conway, cited in Drinkwater 1992, Sustainable rural livelihoods: practical concepts for the 21st century, Institute of Development Studies Discussion Paper 296, Brighton, UK: IDS, 1992 |
[11] | Mohammed K. Hamadina, Dimie Otobotekere and Donald I. Anyanwu, Impact Assessment and Biodiversity Considerations in Nigeria: A Case Study of Niger Delta University Campus Project on Wildlife in Nun River Forest Reserve, 18/2 Manage of Environ Quality: An Int’l Journal 179, 195, 2007. |
[12] | E. J. Alagoa, The People: Traditions of Origin, in E .J. Alagoa ed., The Land and People of Bayelsa State, Central Niger Delta 73, Port Harcourt: Onyoma Research Publications, 1999. |
[13] | Allan Ingelson and Chilenye Nwapi, Environmental Impact Assessment Process for Oil, Gas and Mining Projects in Nigeria: A Critical Analysis, 10/1 Law, Environment and Development Journal, p. 35, available at (http://www.lead-journal.org/content/14035.pdf), 2014. |
[14] | Surgil Project ESIA – Volume II, ESIA Report - Final Draft, November 2011, Uz-Kor Gas Chemical, 2011. |
[15] | ESIA/EA GUIDELINES, Environment and Social Impact Assessment and Audit Guidelines for the Downstream Petroleum Sub-sector, Energy Regulatory Commission, June 2012. |
[16] | Oil and Gas Pipelines Social and Environmental Impact Assessment, State of the Art, Editor Robert Goodland, Robert Goodland, for IAIA 2005 Conference International Association of Impact Assessment, May 2005. |
[17] | Environmental and Social Impact Assessment (ESIA) Report for the Nairobi Transmission Ring Project, Kenya Power and Lighting Company, Prepared by Kamfor Company Ltd. and Elaine Tyldesley, May 2011. |
[18] | B. Noble, B. and K. Storey, Towards increasing the utility of follow-up in Canadian EIA, Environmental Impact Assessment Review, 25(2): 163-180, 2005. |
[19] | Environmental and Social Impact Assessment (ESIA) Report for the Nairobi Transmission Ring Project, Kenya Power and Lighting Company, Prepared by Kamfor Company Ltd. and Elaine Tyldesley, May 2011. |
[20] | B. Noble, Auditing strategic environmental assessment practice in Canada, Journal of Environmental Assessment Policyand Management, 5: 127-147, 2003. |
[21] | A. Morrison-Saunders, R. Marshall and J. Arts, EIA Follow-up International Best Practice Principles. Special Publications Series No.6, International Association for Impact Assessment, Fargo, USA, 2007. |
[22] | A. Morrison-Saunders, B. Jenkins and J. Bailey, EIA follow-up and adaptive management, in: A. Morrison-Saunders, A. and J. Arts J. (eds.) Assessing Impact: Handbook of EIA and SEA Follow-up, Earthscan, London, pp. 154-177, 2004. |
APA Style
Huseyin Murat Cekirge, Omar K. M. Ouda, Ammar Elhassan. (2015). A Method for Preparing Environmental Social Impact Assessment (ESIA) of Crude Oil and Gas Pipelines. International Journal of Environmental Monitoring and Analysis, 3(3), 154-161. https://doi.org/10.11648/j.ijema.20150303.17
ACS Style
Huseyin Murat Cekirge; Omar K. M. Ouda; Ammar Elhassan. A Method for Preparing Environmental Social Impact Assessment (ESIA) of Crude Oil and Gas Pipelines. Int. J. Environ. Monit. Anal. 2015, 3(3), 154-161. doi: 10.11648/j.ijema.20150303.17
AMA Style
Huseyin Murat Cekirge, Omar K. M. Ouda, Ammar Elhassan. A Method for Preparing Environmental Social Impact Assessment (ESIA) of Crude Oil and Gas Pipelines. Int J Environ Monit Anal. 2015;3(3):154-161. doi: 10.11648/j.ijema.20150303.17
@article{10.11648/j.ijema.20150303.17, author = {Huseyin Murat Cekirge and Omar K. M. Ouda and Ammar Elhassan}, title = {A Method for Preparing Environmental Social Impact Assessment (ESIA) of Crude Oil and Gas Pipelines}, journal = {International Journal of Environmental Monitoring and Analysis}, volume = {3}, number = {3}, pages = {154-161}, doi = {10.11648/j.ijema.20150303.17}, url = {https://doi.org/10.11648/j.ijema.20150303.17}, eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.ijema.20150303.17}, abstract = {The principles of preparing ESIA for crude oil and gas pipelines are introduced and various stages of the report development are presented. The paper is a guideline for preparing an ESIA without any omitted measures of an oil or gas pipeline. These guidelines are presented in detail and will be handbook of presenting and introducing mitigation measures. It is aimed at presenting non quantitative ESIA and however at detailed flow of ESIA preparation.}, year = {2015} }
TY - JOUR T1 - A Method for Preparing Environmental Social Impact Assessment (ESIA) of Crude Oil and Gas Pipelines AU - Huseyin Murat Cekirge AU - Omar K. M. Ouda AU - Ammar Elhassan Y1 - 2015/05/06 PY - 2015 N1 - https://doi.org/10.11648/j.ijema.20150303.17 DO - 10.11648/j.ijema.20150303.17 T2 - International Journal of Environmental Monitoring and Analysis JF - International Journal of Environmental Monitoring and Analysis JO - International Journal of Environmental Monitoring and Analysis SP - 154 EP - 161 PB - Science Publishing Group SN - 2328-7667 UR - https://doi.org/10.11648/j.ijema.20150303.17 AB - The principles of preparing ESIA for crude oil and gas pipelines are introduced and various stages of the report development are presented. The paper is a guideline for preparing an ESIA without any omitted measures of an oil or gas pipeline. These guidelines are presented in detail and will be handbook of presenting and introducing mitigation measures. It is aimed at presenting non quantitative ESIA and however at detailed flow of ESIA preparation. VL - 3 IS - 3 ER -