Combined with the project of China Port Museum, the Paper has mainly introduced the application of BIM technology in the stage of deepening design of complex architecture projects. Through the three-dimensional model, it can quickly find and solve the contradictions and design mistakes in the drawings, having perfected the structure system, optimized the details, improved the efficiency and accuracy of the project’s deepening design and guaranteed the correctness of the subsequent component processing and the smooth progress of site installation.
Published in | Journal of Civil, Construction and Environmental Engineering (Volume 3, Issue 3) |
DOI | 10.11648/j.jccee.20180303.12 |
Page(s) | 53-63 |
Creative Commons |
This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited. |
Copyright |
Copyright © The Author(s), 2018. Published by Science Publishing Group |
Information, Bionic Architecture, Modeling, Building Information Modeling (BIM), Application
[1] | Code for Construction of Steel Structures: GB50755-2012 [S] Beijing: China Architecture & Building Press, 2012. |
[2] | Research Bureau of Architectural Science of Ministry of Heavy Industry, Research Institute of Construction of Ministry of Heavy Industry. Code for Acceptance of Construction Quality of Steel Structures: GB 50205-2001 (S). Beijing: China Planning Press, 2002. |
[3] | Zhang Jianhua, Liu Qiang and Zhang Mi, et al. Research of Owner Dominated BIM Application in Shanghai International Financial Center Project [J]. Construction Technology, 2015. 44 (6): 29-34. |
[4] | Liu Zhansheng, Ma Jinshu and Wei Qixing, et al. Applied Research of BIM Technology on Construction Management of Xuzhou Olympic Sports Center Stadium [J]. Construction Technology, 2015. 44 (6): 35-39. |
[5] | Zhao Xuefeng, Yao Aijun and Liu Dongming, et al. Application of BIM Technology in China Zun Tower Foundation Engineering [J]. Construction Technology, 2015, 44 (6): 49-53. |
[6] | He Jianjun, Qian Manzu and Chen Xinxi, et al. BIM Technology Application of Working Surface Division in China Expo Exhibition Complex Project [J]. Construction Technology, 2015, 44(6): 46-48. |
[7] | Dong Litao, Xu Hantao and Cao Le, et al. BIM Application in The Construction of Stiff Columns of WuHan Greenland Center [J]. Joumal of Information Technology in Civil Engineering and Architcture, 2015, 7(4):41-43 |
[8] | Li Xiangjin, Xu Jun, et al. Construction Project Information Management based on BIM Model [J]. Joumal of Information Technology In Civil Engineering and Architcture, 2015, 7(6): 83-86. |
[9] | Chen Jiajia, Zhu Yan, et al. Application of BIM Technology in TianJin YongJi Garden II Phase [J]. Joumal of Information Technology In Civil Engineering and Architcture, 2015, 7(6):91-95. |
[10] | Jiao Ke, Yang Yuanfeng and Zhou Kaixuan, et al. Study on Whole Process of Structure Design Method based on BIM [J]. Joumal of Information Technology In Civil Engineering and Architcture, 2015, 7(5):1-7. |
[11] | Wang Yong, Li Jiulin and Zhang Jianping, et al. Research on Management Mechnaisim of BIM Model in Building Collaborative Design [J]. Joumal of Information Technology In Civil Engineering and Architcture, 2014, 6 (6):64-69. |
[12] | Chen Shun. Application of BIM Technique in Wu Han Center Project [J] Architecture Technology, 2014, 45 (12): 1127-1130. |
APA Style
Wang Zhanliang, Tian Xiugang. (2018). Application of BIM Technology in the Drawing Deepening Stage of China Port Museum. Journal of Civil, Construction and Environmental Engineering, 3(3), 53-63. https://doi.org/10.11648/j.jccee.20180303.12
ACS Style
Wang Zhanliang; Tian Xiugang. Application of BIM Technology in the Drawing Deepening Stage of China Port Museum. J. Civ. Constr. Environ. Eng. 2018, 3(3), 53-63. doi: 10.11648/j.jccee.20180303.12
AMA Style
Wang Zhanliang, Tian Xiugang. Application of BIM Technology in the Drawing Deepening Stage of China Port Museum. J Civ Constr Environ Eng. 2018;3(3):53-63. doi: 10.11648/j.jccee.20180303.12
@article{10.11648/j.jccee.20180303.12, author = {Wang Zhanliang and Tian Xiugang}, title = {Application of BIM Technology in the Drawing Deepening Stage of China Port Museum}, journal = {Journal of Civil, Construction and Environmental Engineering}, volume = {3}, number = {3}, pages = {53-63}, doi = {10.11648/j.jccee.20180303.12}, url = {https://doi.org/10.11648/j.jccee.20180303.12}, eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.jccee.20180303.12}, abstract = {Combined with the project of China Port Museum, the Paper has mainly introduced the application of BIM technology in the stage of deepening design of complex architecture projects. Through the three-dimensional model, it can quickly find and solve the contradictions and design mistakes in the drawings, having perfected the structure system, optimized the details, improved the efficiency and accuracy of the project’s deepening design and guaranteed the correctness of the subsequent component processing and the smooth progress of site installation.}, year = {2018} }
TY - JOUR T1 - Application of BIM Technology in the Drawing Deepening Stage of China Port Museum AU - Wang Zhanliang AU - Tian Xiugang Y1 - 2018/08/01 PY - 2018 N1 - https://doi.org/10.11648/j.jccee.20180303.12 DO - 10.11648/j.jccee.20180303.12 T2 - Journal of Civil, Construction and Environmental Engineering JF - Journal of Civil, Construction and Environmental Engineering JO - Journal of Civil, Construction and Environmental Engineering SP - 53 EP - 63 PB - Science Publishing Group SN - 2637-3890 UR - https://doi.org/10.11648/j.jccee.20180303.12 AB - Combined with the project of China Port Museum, the Paper has mainly introduced the application of BIM technology in the stage of deepening design of complex architecture projects. Through the three-dimensional model, it can quickly find and solve the contradictions and design mistakes in the drawings, having perfected the structure system, optimized the details, improved the efficiency and accuracy of the project’s deepening design and guaranteed the correctness of the subsequent component processing and the smooth progress of site installation. VL - 3 IS - 3 ER -