This research aimed at investigating the causes and effects of abandoned building construction project in Abuja Municipal Area Councils (AMAC) of FCT, Nigeria so as to proffer solution to the problem(s). This research uses a qualitative method of research in which a structured close ended questionnaire was prepared to capture information on the causes and effects of abandoned building construction projects in AMAC. It was on this basis that a structured questionnaire with Likert Scale design method was adopted. One hundred and ten (110) consultants obtained from professional bodies like Council for Regulation of Engineering (COREN), Council of Registered Builders of Nigeria (CORBON), Architect Registration Council of Nigeria (ARCON), Quantity Surveyors Registration Board of Nigeria (QSRBN) and Procurement Consultants were contacted to get their views on abandonment of building construction project. Eighty-Eight (88) responses were obtained to give a return rate of 80%. All information found were analysed using the Relative Importance Index (R.I.I) formula. The higher the Relative Importance Index value, the more significant is the cause or effect of abandoning building project. Sixteen (16) important causes of abandoning building construction project and nine (9) main effect of abandoning building construction project were identified. This research therefore concluded that if the causes and effects of abandoning building construction projects are corrected through the application of numerous recommendations made on this research, building construction project abandonment will be history in the research area and indeed the country at large.

Published in Journal of Civil, Construction and Environmental Engineering (Volume 8, Issue 3)
DOI 10.11648/j.jccee.20230803.11
Page(s) 42-48
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2023. Published by Science Publishing Group

Keywords

Building Construction Projects, Abandoned, Causes, Effects, FCT-Abuja

References
[1] Kolawole O. J. (2006), “A review of Abandoned Projects cases in Nigeria.” A publication in Builder’s Voice – A publication of National Association of Building Students – Federal Polytechnic, Offa chapter. Offa: Metro-print Concept.
[2] Assaf, S. A., Alkhalil, M. and Al-Hazmi, M. (1995), “Causes of delay in large building construction projects,” in J. Manage. Eng., ASCE. 11 (2), pp. 45-50.
[3] Saleh, A. T. (2009). “Causes of Delay in Construction Projects in Libya,” The Int. Conference on Economics &Administration, Faculty of Administration and Business University of Bucharest Romania; ICEA- FAA Buncharest, 14-15 Nov 2009.
[4] Ayodele, E. O. and Alabi, O. M., (2011), “Abandonment of Construction Projects in Nigeria: Causes and Effects,” in Journal of Emerging Trends in Economics and Management Sciences, 2 (2), pp. 142-145.
[5] Akindele, O. A. (2013) “Environmental Effects of Abandoned Properties in Ogbomoso and Osogbo Nigeria,” in Ethiopian Journal of Environmental Studies and Management, 6 (2), pp. 707-716.
[6] Akindoyeni. A, (1989), “The management of abandoned project,” in Journal of Nigerian Institute of Building, 1 (2), pp. 27.
[7] Onukwube, H. N. (2005), “Cash Flow and Financial Management in Some Selected Nigerian Construction Firms,” in Nigeria Institute of Quantity Surveyor 51 (2), pp. 3-10.
[8] Adeleke S. A, (2005), “Abandonment of Federal Government Low-Cost Housing Estate,” An unpublished HND project submitted to Department of Building Technology, Federal Polytechnic, Offa.
[9] El-Rufai, N. A. (2012), “The tragedy of abandoned projects.” Nigeria Intel. Retrieved from https://www.premiumtimesng.com/opinion/98468-the-tragedy-of-abandoned-projects-by-nasir-el-rufai.html?tztc=1 accessed on 15th February, 2023.
[10] Samantha T and Wallace J. (2013), “Data driven organizing: A community-Unversity partnership to address vacant and abandoned projects,” in Journal of Community Practice, 21 (3), pp. 248-262.
[11] Lim, E. C. and Alum, J. (1995), “Construction Productivity: Issues Encountered by Contractors in Singapore,” in International Journal of Project Management, 13 (1), pp. 51-58.
[12] Kotangora O. O., (1993), “Project Abandonment,” in Nigerian Tribune, pp. 5-6, June 10.
[13] Osemenan I., (1987), “Project abandonment,” in NewWatch Magazine, 1 (1), pp. 15.
[14] Odenyinka, H. A. and Yusuf, A. (1997), “The Causes and Effects of Construction Delays on Cost of Housing Project in Nigeria,” in Journal of Financial Management and Property and Construction, 2, pp. 31-41.
[15] Ihuah, P. W. and Fortune, J. C. (2013), “Toward a Framework for the Sustainable Management of Social (Public) Housing Estates in Nigeria,” in Journal of US-China Public Administration, 10 (9), pp. 901-913.
[16] Ihuah, P. W. and Eaton, D. (2013), “A Framework for the Sustainable Management of Social (Public) Housing Estates in Nigeria: a pilot study,” A Paper Presented at RICS COBRA Research Conference, New Delhi, India.
[17] NHP (2011), “National Housing Policy Draft,” Federal Government of Nigeria, Abuja.
[18] Ewa, U. E. (2005), “The Budgetary process and educational development-Emphasis on how to avoid abandoned projects.” Education Tax Fund workshop on financing education in Nigeria.
[19] Omoniyi, M. I. (1996), “A critical analysis of abandonment of projects,” in Journal of Building Sciences and Management. 11 (1), pp. 4-10.
[20] Onikute, A. B. (1988), “Effects of Contract Termination on The Cost of Building Project,” in Builders Magazine, 5 (19), pp 5-18.
[21] Adedeji, A. O. (1998), “Inflation of Production Planning Techniques on the Performance of Construction Firms in Nigeria,” in Journal of the Federation of Building Contractor in Nigeria, 13 (1), pp. 3-24.
[22] Essenwa, F. O. Jr (2004), “Project Procurement Method in Due Process or How to Execute Capital Project Effectively,” Department of Physical Planning and Development, Nigerian Universities Commission Abuja, Nigeria.
[23] Opara, N. (1986), “Construction Management Control and Planning,” in Journal of Construction Economics, 3, pp. 12-15.
[24] Olusegun A. E, Michael A. O, (2011), “Abandoned of Construction Project in Nigeria: Causes and Effects”, in Journal of Emerging Trends in Economics and Management Sciences (JETEMS), 2 (2), pp. 142-145.
[25] Aluko O. O, (2008), “Construction Project Abandonment in Nigeria: A Threat to National Economy, Knowledge Review,” 16 (3), pp. 18-23.
[26] Abdul Kadir, M. R., Lee, W. P., Jaafar, M. S., Sapuan, S. M. and Ali, A. A. A. (2005), “Factors Affecting Construction Labour Productivity for Malaysian Residential Projects, Structural Survey”, 23 (1), pp. 42-54.
[27] Tomas, U. G. (2013), “Forensic Investigation of Abandoned GSIS Building in Manila,” in International Journal of Disaster Recovery and Business Continuity, 4, pp. 23-34.
[28] Ibrahim, T. A. (2013), “Causes and Effects of Construction Projects Abandonment,” in Ilorin Metropolis Scientific Research and Impact, 3 (4), pp. 65-74.
Cite This Article
  • APA Style

    Jibrin Sule, Miiraj Abdulmumin, Abdukadir Sabo Osu. (2023). Views of Specialists on Abandoned Building Project in FCT - Abuja, Nigeria. Journal of Civil, Construction and Environmental Engineering, 8(3), 42-48. https://doi.org/10.11648/j.jccee.20230803.11

    Copy | Download

    ACS Style

    Jibrin Sule; Miiraj Abdulmumin; Abdukadir Sabo Osu. Views of Specialists on Abandoned Building Project in FCT - Abuja, Nigeria. J. Civ. Constr. Environ. Eng. 2023, 8(3), 42-48. doi: 10.11648/j.jccee.20230803.11

    Copy | Download

    AMA Style

    Jibrin Sule, Miiraj Abdulmumin, Abdukadir Sabo Osu. Views of Specialists on Abandoned Building Project in FCT - Abuja, Nigeria. J Civ Constr Environ Eng. 2023;8(3):42-48. doi: 10.11648/j.jccee.20230803.11

    Copy | Download

  • @article{10.11648/j.jccee.20230803.11,
      author = {Jibrin Sule and Miiraj Abdulmumin and Abdukadir Sabo Osu},
      title = {Views of Specialists on Abandoned Building Project in FCT - Abuja, Nigeria},
      journal = {Journal of Civil, Construction and Environmental Engineering},
      volume = {8},
      number = {3},
      pages = {42-48},
      doi = {10.11648/j.jccee.20230803.11},
      url = {https://doi.org/10.11648/j.jccee.20230803.11},
      eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.jccee.20230803.11},
      abstract = {This research aimed at investigating the causes and effects of abandoned building construction project in Abuja Municipal Area Councils (AMAC) of FCT, Nigeria so as to proffer solution to the problem(s). This research uses a qualitative method of research in which a structured close ended questionnaire was prepared to capture information on the causes and effects of abandoned building construction projects in AMAC. It was on this basis that a structured questionnaire with Likert Scale design method was adopted. One hundred and ten (110) consultants obtained from professional bodies like Council for Regulation of Engineering (COREN), Council of Registered Builders of Nigeria (CORBON), Architect Registration Council of Nigeria (ARCON), Quantity Surveyors Registration Board of Nigeria (QSRBN) and Procurement Consultants were contacted to get their views on abandonment of building construction project. Eighty-Eight (88) responses were obtained to give a return rate of 80%. All information found were analysed using the Relative Importance Index (R.I.I) formula. The higher the Relative Importance Index value, the more significant is the cause or effect of abandoning building project. Sixteen (16) important causes of abandoning building construction project and nine (9) main effect of abandoning building construction project were identified. This research therefore concluded that if the causes and effects of abandoning building construction projects are corrected through the application of numerous recommendations made on this research, building construction project abandonment will be history in the research area and indeed the country at large.},
     year = {2023}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Views of Specialists on Abandoned Building Project in FCT - Abuja, Nigeria
    AU  - Jibrin Sule
    AU  - Miiraj Abdulmumin
    AU  - Abdukadir Sabo Osu
    Y1  - 2023/05/31
    PY  - 2023
    N1  - https://doi.org/10.11648/j.jccee.20230803.11
    DO  - 10.11648/j.jccee.20230803.11
    T2  - Journal of Civil, Construction and Environmental Engineering
    JF  - Journal of Civil, Construction and Environmental Engineering
    JO  - Journal of Civil, Construction and Environmental Engineering
    SP  - 42
    EP  - 48
    PB  - Science Publishing Group
    SN  - 2637-3890
    UR  - https://doi.org/10.11648/j.jccee.20230803.11
    AB  - This research aimed at investigating the causes and effects of abandoned building construction project in Abuja Municipal Area Councils (AMAC) of FCT, Nigeria so as to proffer solution to the problem(s). This research uses a qualitative method of research in which a structured close ended questionnaire was prepared to capture information on the causes and effects of abandoned building construction projects in AMAC. It was on this basis that a structured questionnaire with Likert Scale design method was adopted. One hundred and ten (110) consultants obtained from professional bodies like Council for Regulation of Engineering (COREN), Council of Registered Builders of Nigeria (CORBON), Architect Registration Council of Nigeria (ARCON), Quantity Surveyors Registration Board of Nigeria (QSRBN) and Procurement Consultants were contacted to get their views on abandonment of building construction project. Eighty-Eight (88) responses were obtained to give a return rate of 80%. All information found were analysed using the Relative Importance Index (R.I.I) formula. The higher the Relative Importance Index value, the more significant is the cause or effect of abandoning building project. Sixteen (16) important causes of abandoning building construction project and nine (9) main effect of abandoning building construction project were identified. This research therefore concluded that if the causes and effects of abandoning building construction projects are corrected through the application of numerous recommendations made on this research, building construction project abandonment will be history in the research area and indeed the country at large.
    VL  - 8
    IS  - 3
    ER  - 

    Copy | Download

Author Information
  • Building Research Department, Nigerian Building and Road Research Institute, Abuja, Nigeria

  • Civil Engineering Department, University of Ilorin, Ilorin, Nigeria

  • Civil Engineering Technology Department, Federal Polytechnic, Nasarawa, Nigeria

  • Sections