Journal of Civil, Construction and Environmental Engineering

Volume 1, Issue 1, December 2016

  • The Application of Graphical Method to Create Sandy Soils with Given Physic-Mechanical Properties

    Korolev V. A., Zhang Shengrong

    Issue: Volume 1, Issue 1, December 2016
    Pages: 1-11
    Received: 3 October 2016
    Accepted: 14 October 2016
    Published: 19 November 2016
    DOI: 10.11648/j.jccee.20160101.11
    Downloads:
    Views:
    Abstract: In the article we mainly discussed how to adopt graphical method to show the influence of particle size on the mechanical properties of mixed soils. Based on the extensive experimental data, using triangle graphics, as well as software Matlab, we could describe and model the change of the mechanical properties of mixed soils. Through this method, w... Show More
  • Bidding Strategy Using Friedman Model for Building Construction Project in Banjarbaru Indonesia

    Candra Yuliana, Retna Hapsari Kartadipura, Syahril Taufik

    Issue: Volume 1, Issue 1, December 2016
    Pages: 12-17
    Received: 17 October 2016
    Accepted: 28 October 2016
    Published: 19 November 2016
    DOI: 10.11648/j.jccee.20160101.12
    Downloads:
    Views:
    Abstract: Determining a good price in competitive bidding is a common problem for the construction company. An offer price could be too high for contractors hoping to get a big profit with no risk to get the project, or too low in the hope of getting a lot of projects but at the risk of losing opportunity to get benefits and risks of failure in carrying out ... Show More
  • Investigating Causes of Construction Delay in Ethiopian Construction Industries

    Werku Koshe, K. N. Jha

    Issue: Volume 1, Issue 1, December 2016
    Pages: 18-29
    Received: 17 October 2016
    Accepted: 4 November 2016
    Published: 2 December 2016
    DOI: 10.11648/j.jccee.20160101.13
    Downloads:
    Views:
    Abstract: Construction delays are occurring in every phase of a construction project and are common problems in construction projects in Ethiopia. Moreover, it is well known that the delays in construction projects are the major causes of project failure. If the delay is not identified and the corrective project management decision is not taken in time a pro... Show More
  • Modelling of Retention Reservoirs Network Running to Optimize the Storm Water Management

    Amamba Itoumba F., Buyle-Bodin F., Blanpain O.

    Issue: Volume 1, Issue 1, December 2016
    Pages: 30-33
    Received: 19 October 2016
    Accepted: 2 November 2016
    Published: 5 December 2016
    DOI: 10.11648/j.jccee.20160101.14
    Downloads:
    Views:
    Abstract: In urban environments, or in the areas where storms are frequent and violent, it is advisable to temporarily store rainfall in balancing reservoir before slackening them with flow controlled in the sewer system or in the natural environment, which limits the risks of flood and the environmental impact. The dimension of these reservoirs can be sizea... Show More
  • A Development Framework to Support the Life Cycle Facility Management Information Services for Residential Complex

    Jin Su Jeong

    Issue: Volume 1, Issue 1, December 2016
    Pages: 34-41
    Received: 31 October 2016
    Accepted: 15 November 2016
    Published: 16 December 2016
    DOI: 10.11648/j.jccee.20160101.15
    Downloads:
    Views:
    Abstract: This research investigates the feasibility of web technology as a means of delivering facility information services for better support facility operation and maintenance. Our research proposes a web-based service request and feedback system as a pragmatic solution to the limitations of current facility management (FM) processes with a case study of... Show More